Requirements
Glyn Nuttall Ltd. were asked to remove the existing central battery system, the adapting of the existing wiring and the part rewire to new luminaire positions.
Work undertaken
Emergency lighting was afforded to the two main hall areas, escape routes, both internal and external and common areas, comprising of maintained and non maintained fittings. The system was designed, installed and commissioned in accordance to BS5266.
